+44 0115 937 5121 +44 0115 937 5116 Trace Works, Debdale Lane, Keyworth, Nottingham, NG12 5HN
High Speed Underfloor Heating Mat From Hemstedt

High Speed Underfloor Heating Mat From Hemstedt

Cross Electrical (Nottingham) Ltd supplies and installs the Hemstedt TWIN TURBO MAT throughout the East Midlands and the rest of the UK.

The TWIN TURBO MAT is the heating mat used for economical heating. The heating mat is installed within the tile adhesive layer. This particularly thin heating mat with a thinner, sleeveless splice can be used in renovation work as well as new low energy housing.

The TWIN TURBO MAT has a reserve heating cable that ensures comfort heating operation can be maintained, even if one heating circuit should fail.

This Offers Numerous Advantages:

  • You receive a heating mat set with two identical heating circuits.
  • You avoid a cold room in case of a possible heating circuit failure.
  • You save extensive costs for time costing troubleshooting and repair.
Underfloor Hemstedt Heating

Sleeveless Cable Splice

The cold lead to heating cable splice is now sleeveless, which means that the known installation problems of heat shrink tubing are now a part of history. This drastically simplifies the work during the installation process. Sequence operations can be implemented as planned.

The sleeveless splice is completely waterproof and therefore ideal for installations that require protection against moisture.

  • Sleeveless splice between cold lead and heating cable
  • Provided sleeveless direct from manufacturer
  • 100% waterproof
  • Self-adhesive

Your Thoughts

Can you please pass on our thanks to Martyn and his team for the excellent work that they have done for us this weekend. Despite challenging weather conditions they managed to complete the planned works in good time. We have test run the dryer this afternoon and all is good. Many thanks. Paul Taylor

Tarmac – Caldon Asphalt

Impressed with attention to detail and management of a project straight through to the end, excellent approach with health and safety on Site, excellent documentation and follow up. Regards Iain Pieroway

ForFamers (Penrith)

Very pleased collectively and finding Cross Electrical (Nottingham) Ltd flexible and approachable with a difficult project that required a quick turn-around. Regards Geoff Marshall

Tetretech

Managed and developed a project with complete resolution, delivered - following long hours, updates and accommodating the client requirements to an end solution. Rafael Taylor

Sterigenics

Excellent communication, very professional and can offer solutions to improve plant - very reliable, outstanding all round service. Regards John Glasspool

Aggregate Industries Botley

1
2
3
4
5

We have placed cookies on your device to help make this website better. You can click the link below to disable cookies, otherwise, we'll assume you're happy to continue
Close This Notice

Disable Cookies | 3rd Party Data Processors