Green Electric Mat System From Hemstedt

Green Electric Mat System From Hemstedt

Electrical heating is a fundamental element of the future energy market. It ensures sufficient heating in a future energy economy, likely to be dominated by solar and other electrical renewables. Regenerative natural resources like wood, biogas and ground level geothermal energy cannot meet the entire heating energy requirement.

To address this issue, Hemstedt have developed Green Electric Mat®. Green Electric Mat® with unilateral connection and i-sleeve is the floor heating mat that provides economically efficient heating. The mat is placed in tile glue.

This particularly thin mat with slim, sleeveless connection technology can be used in new and old buildings alike. The desired heating stages are selected on site with serial switches.

Green Electric Mat® has built-in safety features and has been filed at the European Patent Office. The heating mat also has a reserve heating cable that ensures comfort heating operation can be maintained, even if one heating circuit fails.

DOUBLE SAFETY: Heating cable + reserve heating cable

Green Electric Mat® PV and Green Accu Mat® PV are energy storage heating mats from HEMSTEDT with built-in safety and both systems have been filed at the European Patent Office. Both heating mats have a reserve heating cable that ensures comfort heating operation can be maintained even by failure of one heating circuit.

Green Electric Mat Safety

Your Advantages

  • You receive a heating mat set with two identical heating circuits.
  • You avoid a cold room in case of a possible heating circuit failure.
  • You save extensive costs on labour, troubleshooting and repair.
Green Electric Mat
Green Electric Mat
Green Electric Mat

Your Thoughts

Can you please pass on our thanks to Martyn and his team for the excellent work that they have done for us this weekend. Despite challenging weather conditions they managed to complete the planned works in good time. We have test run the dryer this afternoon and all is good. Many thanks. Paul Taylor

Tarmac – Caldon Asphalt

Impressed with attention to detail and management of a project straight through to the end, excellent approach with health and safety on Site, excellent documentation and follow up. Regards Iain Pieroway

ForFamers (Penrith)

Very pleased collectively and finding Cross Electrical (Nottingham) Ltd flexible and approachable with a difficult project that required a quick turn-around. Regards Geoff Marshall

Tetretech

Managed and developed a project with complete resolution, delivered - following long hours, updates and accommodating the client requirements to an end solution. Rafael Taylor

Sterigenics

Excellent communication, very professional and can offer solutions to improve plant - very reliable, outstanding all round service. Regards John Glasspool

Aggregate Industries Botley

1
2
3
4
5

We have placed cookies on your device to help make this website better. You can click the link below to disable cookies, otherwise, we'll assume you're happy to continue
Close This Notice

Disable Cookies | 3rd Party Data Processors